Infrastructure

 

Vidyalaya Infrastructure
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
: 30 acres
 
: YES
 
 
: 22.09.1999
 
 
:
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
: (Completed / Incomplete)
 
Completed
NA
iii
Permanent buildings constructed
 
 
: (CBRI pattern/ CPWD pattern)
CPWD pattern
iv
School building
 
 
 
: Complete
v
Dormitories
:  Boys 07  Nos.
   with Warden Residence 07 Nos.
 
 
 
:  Girls 04 Nos.
   with Warden Residence 04 Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete
 
 
    02
vii
Principal Residence
 
 
:  01 No.
viii
Staff Quarters
 
 
 
 
: Type III = 16  Nos.
  Type II = 01  Nos.
  Type  I  = 12 Nos.
  SP Sheds converted into
 Staff Qrs.: 00 Nos.
ix
M.P. Hall
 
:  not available
x
Workshop
 
:  not available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
:  Column based
 
:  100000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
: 100000 litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
: Available
: Kirlosker make
: 15 KV
: Working
: Year of procurement - 2000
 
xiv
Sewage Pump
 
: NOT AVAILABE
xv
Water Pump
 
 
: 10 HP capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 : City Feeder
:  Complete
: 70 Nos. of Poles
 
: 24 hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
:  not available
:  not available
:  not available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Non Potable,  03 Nos.-  working
: NA
:  NA
xix
Rajiv Gandhi Smriti Van
 
:  Available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
:  June–2009
:  June–2009
xxii
Whether area around transformer is fenced
:   No
xxiii
Whether open wells, if any, are covered from top
:   NA
xxiv
Works taken up under M&R fund during current year and last year:-
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2010-11
 
3.00
3.00
 
2011-12
 
3.00
3.00